Minggu, 27 Mei 2012

PENGARTURAN SF


STAMFORMASI KA BBR TMB-THN
MULAI THT  05/05 2012 :
KE TARAHAN :
1.    4KA  X 60 GERBONG = 240 GERBONG X 50 TON   = 12.000 TON
2.    6KA X 44 GERBONG = 264 GERBONG X 50 TON    = 13.200 TON
3.    3KA X 40 GERBONG = 120 GERBONG X 50 TON    = 6.000 TON
 31.200 TON PER HARI
Ø 31.200 TON X 29 H0 = 904.800  TON X 12 BULAN = 10.857.600 TON
PROGRAM 1 TAHUN
RENCANA PENCAPAIAN
13.200.000  TON
10.857.600 TON

KE KPT :
4.    6KA X 35 GERBONG  = 210 GERBONG  X  30 TON  = 6.300 TON
Ø 6.300 TON X  29 HO = 182.700 TON  X 12 BULAN = 2.192.400  TON .

PROGRAM 1 TAHUN
RENCANA PENCAPAIAN
2.600.000 TON
2.192.400 TON

5.    1 KA X 30 TON X 19 GERBONG    =  570TON  X 29HO =  16.530 TON X 12 BULAN = 198.360 TON



STAMFORMASI KA BBR TMB-THN
MULAI THT  14/05 2012 :
KE TARAHAN :
-         6KA  X 60 GERBONG = 360 GERBONG X 50 TON   = 18.000 TON
-         4KA X 44 GERBONG = 176  GERBONG X 50 TON    = 8.800TON
-         3KA X 40 GERBONG = 120 GERBONG X 50 TON    = 6.000 TON
 32.800TON PER HARI
Ø 32.800 TON X 29 H0 = 951.200TON X 12 BULAN = 11.414.400TON
PROGRAM 1 TAHUN
RENCANA PENCAPAIAN
13.200.000  TON
11.414.400TON

KE KPT :
-         6KA X 35 GERBONG  = 210 GERBONG  X  30 TON  = 6.300 TON
Ø 6.300 TON X  29 HO = 182.700 TON  X 12 BULAN = 2.192.400  TON .

PROGRAM 1 TAHUN
RENCANA PENCAPAIAN
2.600.000 TON
2.192.400N

-         1 KA X 30 TON X 19 GERBONG    =  570TON  X 29HO =  16.530 TON X 12 BULAN = 198.360 TON




STAMFORMASI KA BBR TMB-THN
MULAI THT         2012 :
KE TARAHAN :
6.    8KA  X 60 GERBONG = 480GERBONG X 50 TON   = 24.000 TON
7.    2KA X 44 GERBONG =   88 GERBONG X 50 TON    =  4.400 TON
8.    3KA X 40 GERBONG = 120 GERBONG X 50 TON    = 6.000 TON
 31.200 TON PER HARI
Ø 34.400TON X 29 H0 = 997 TON X 12 BULAN = 11.971.200TON
PROGRAM 1 TAHUN
RENCANA PENCAPAIAN
13.200.000  TON
11.971.200 TON

KE KPT :
9.    6KA X 35 GERBONG  = 210 GERBONG  X  30 TON  = 6.300 TON
Ø 6.300 TON X  29 HO = 182.700 TON  X 12 BULAN = 2.192.400  TON .

PROGRAM 1 TAHUN
RENCANA PENCAPAIAN
2.600.000 TON
2.192.400 TON

10.                       1 KA X 30 TON X 19 GERBONG    =  570TON  X 29HO =  16.530 TON X 12 BULAN = 198.360 TON




STAMFORMASI KA BBR TMB-THN
MULAI THT                 :
KE TARAHAN :
-         10KA  X 60 GERBONG = 600GERBONG X 50 TON   = 30.000 TON
-         3KA X 40 GERBONG = 120 GERBONG X 50 TON    = 6.000 TON
 31.200 TON PER HARI
Ø 36.000TON X 29 H0 = 1.044.000TON X 12 BULAN = 10.857.600 TON
PROGRAM 1 TAHUN
RENCANA PENCAPAIAN
13.200.000  TON
12.528.000 TON

KE KPT :
11.                       6KA X 35 GERBONG  = 210 GERBONG  X  30 TON  = 6.300 TON
Ø 6.300 TON X  29 HO = 182.700 TON  X 12 BULAN = 2.192.400  TON .

PROGRAM 1 TAHUN
RENCANA PENCAPAIAN
2.600.000 TON
2.192.400 TON

12.                       1 KA X 30 TON X 19 GERBONG    =  570TON  X 29HO =  16.530 TON X 12 BULAN = 198.360 TON